An on single workstations posed a challenge for Siemens in Karlsruhe. Fast and flexible planning was required.
"Workstation design is now four times faster for us. At the same time, we were able to involve people early on in the planning process and thus create tailor-made solutions."
– Albert Franz, Industrial Engineer