A good hall layout arranges routes, times, and floor space so that safety, material flow, ergonomics, and capacity work together reliably. Variant diversity, the shortage of skilled workers, and shorter lead times increase the pressure to make decisions before rebuilding. Column grids, utility points, fire protection, and traffic routes set the framework, and from that you shape a working factory layout.
Even small distances add up. If you save 25 m of walking per order at a walking speed of 0.8 m/s, that's 31.25 seconds on average. With 100 orders a day, that adds up to around 52 minutes less walking time. These minutes show up in metrics such as transport distances, cycle times, and space utilization, and they make bottlenecks visible.
If you follow a clear approach, from the requirements profile through variants and checked zones to reliable metrics, layout planning gets faster, the risk of rebuilding goes down, and assembly workstations become more ergonomic.
Start with a clear picture of process and demand. Value stream analysis and SIPOC (supplier, input, process, output, customer) clarify takt, targets for work in process (WIP), changeover and transport times, and the interfaces to logistics and quality. From this, you derive the floor space for goods receiving, pre-assembly, final assembly, test area, supermarket, and shipping, and define proximity relationships, such as short routes between pre-assembly and final assembly or a direct connection from the test area to shipping.
These metrics show whether a layout is smooth, safe, and scalable:
The calculation from the introduction shows how big the lever is: 25 m less per order adds up to around 52 minutes less walking time at 100 orders a day.
Typical mistakes arise from unclear specifications, detailing too early, and isolated solutions. If it isn't explicitly decided whether short routes or low space commitment take priority, planning and operations clash. Pure CAD layouts often underestimate operating areas, lines of sight, and safety distances. This leads to intersections that cause congestion in day-to-day operations. Awkward postures often hide in secondary tasks such as rework or cabling and are overlooked without a systematic check.
A few binding routines help you avoid this:
Visualizations such as spaghetti diagrams for routes or heatmaps for movement density support the discussion when they bring together measurable distances, intersections per shift, and ergonomics assessments.
In VR, distances, heights, and fields of view become tangible at 1:1 scale. You spot collisions with doors, racks, and traffic routes early, check grasping areas with your own sense of your body, and see bottlenecks that stay hidden on 2D plans. Stakeholders from industrial engineering, production, logistics, and occupational safety (HSE) see the same model and agree on a variant faster. Markus Gehle, Managing Director of Rawie, describes how much time this saves: "It used to take us several days to evaluate a new layout – with Halocline we now create several variants in less than an hour and make decisions immediately."
Halocline is the planning platform for production layouts and workstations. You plan shopfloor and factory layouts in 3D, on the desktop and in VR, with no training required. You import CAD data such as STEP as a reference when needed and place library elements via drag and drop. You mark traffic routes and walkways with library elements or boxes and check safety distances with the measuring tool. You record walking routes in VR and analyze them in the spaghetti diagram. The ergonomics analysis based on the key indicator method shows which object movements at the assembly workstation are problematic. You copy variants and compare them based on routes, intersections, and ergonomics.
Here's how to proceed:
Data work stays lean: CAD and STEP data serve as orientation, and iteration happens in the layout model. Reviews get an agenda, risks are discussed directly on the model, and decisions stay traceably documented.
The starting point is a small-batch assembly. Long routes between the supermarket and final assembly cause congestion at a narrow handover point, and screwing requires overhead work. Walking through the model in VR reveals the solution: the supermarket moves 12 m closer, a one-way rule relieves the handover point, and a height-adjustable fixture eliminates the overhead work. The result is 18 percent shorter routes, two fewer planning rounds, and no more critical posture during screwing.
When goals are clear, variants are created early, and metrics support the comparison, VR speeds up coordination and prevents expensive rebuilds. Related topics such as ergonomics in production, factory planning, production planning, and process optimization go deeper into the details and offer additional levers.